Tuesday, May 29, 2007
Shop drawing of bolt plate
Shop drawing of beam
Shop drawing of beam
3D CAD image from Atex steel
Wednesday, May 9, 2007
Seperation joint in conrete slab and column footing
The following Photos are from a site visit to the soon to be Spotlight and Anaconda new premises. It is load bearing precast concrete construction, and is situated on the corner of settlement road and breakwater road in Belmont, the Builder for the project is LYONS Construction which specialses in industrial construction. This photo show the column of stanchioun concreted in with a seperation from the slab flooring, this is achieved by use of a seperation joint which is to allow the slab to expand with out putting pressure onto the column or its pad footing.
D.p.c and steel reo befor a concrete pour
Corner detail in Pre cast Concrete structure
This up close corner detail shows the cast in steel plate used to support the beams
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2007
(41)
▼
May
(23)
Interesting links
Factory and office intersection drawing
Wall intersection with box gutter
Wall intersection drawing
Parapet wall drawing
Atex steel factory fabrication
Cleats just after inhouse welding
Pile drill
Roofing in idustrial construction
Poster in process
Elevation
Typical elevation of factory construction
Load bearing concrete panel with steel rafter conn...
Typical fly bracing for long span construction
Box gutter details
Box gutter engineers drawing
Shop drawing of bolt plate
Shop drawing of beam
Shop drawing of beam
3D CAD image from Atex steel
Seperation joint in conrete slab and column footing
D.p.c and steel reo befor a concrete pour
Corner detail in Pre cast Concrete structure
►
April