http://www.constructiontechnologytoday.com
construction technology advancements
Building Code of Australia
One Steel
Wednesday, May 30, 2007
Tuesday, May 29, 2007
Wednesday, May 9, 2007
Monday, April 23, 2007
Concrete panel connection above roller door entrance
Steel Universial Beam
Concrete Pre-cast building with steel frame
Corner detail in Concrete pre-cast , Steel framed building
Monday, April 2, 2007
Wednesday, March 14, 2007
Tuesday, March 13, 2007
The Arena
Monday, March 12, 2007
Wednesday, March 7, 2007
Monday, March 5, 2007
Greater London Authority Headquarters
This is the HQ for the mayor of London and 500 staff, it is situated right on the south bank of the river Thames. The design is a modified sphere using 2100 tons of steel for the structural frame and 1950 tons for reinforcement. The Architect is Foster and Partners. This modern building has green credentials using triple glazed glass, and water from the water table below for cooling the building and later on for flushing toilets.
Subscribe to:
Posts (Atom)